Description
What this guide helps you do
For the Master of Science (Renewable Energy and Environment), the 12-credit MRWP-002 Major Project is scheduled in semester 4. This IGNOU MSCRWEE project format guide helps learners organise their own engineering or environmental investigation, from planning resources and methods to documenting technical evidence and preparing for the viva.
The course and credits are verified on IGNOU’s programme page. The detailed instructions are based on a third-party-hosted copy of the SOET Major Project handbook; confirm them with the School before submission.
What is different in the MRWP-002 rules
- There are two supervisors: a local technical guide and an internal SOET faculty supervisor.
- The local guide needs a relevant postgraduate degree with at least two years of experience, or a relevant PhD; the limit is five students at a time.
- The handbook advises proposal submission in semester 3, with the final report in semester 4.
- The nine-part synopsis includes a bar-chart schedule and arrangements for sites, laboratories, equipment and tools.
- The proposal goes to the MSCRWEE Projects Coordinator at SOET; the handbook states a written decision within four weeks of receipt.
- The technical report is about 40 to 60 double-spaced typed pages, excluding appendices and exhibits.
- Evaluation comprises 70% for the report and 30% for viva-voce.
What is inside
The English medium PDF contains 15 A4 pages and 11 sections:
- The 12-credit Major Project and its technical scope
- Two supervisors and their respective responsibilities
- The nine synopsis parts and technical methodology
- Bar-chart scheduling and laboratory arrangements
- Proposal packet, School submission and written decision
- Report structure: technical evidence and future scope
- Blank originality statement and supervisor bio-data
- A4 report presentation, references and supporting exhibits
- Semester 4 dispatch, report number and enquiries
- Report evaluation and viva-voce preparation
- Major Project checklist and avoidable errors
What is not inside
This guide has no topic, data, analysis, findings or completed chapters. It is not a sample project and is not for submission. You write your project yourself.
How to use this guide
- Use sections 1 and 2 to identify the technical scope and check your local supervisor’s qualifications.
- Build your own nine-part synopsis using section 3, then organise your activity chart and access to equipment with section 4.
- Check the proposal packet in section 5 and prepare the applicable blank documents in section 7.
- Use sections 6 and 8 to arrange your technical evidence, future scope and references.
- Follow section 9 for report dispatch, section 10 for oral examination preparation and section 11 for a final check.
Formats, price and delivery
- PDF guide: Rs 19. Buy through the shrichakradhar.com store checkout and download after payment.
- Printed hard copy: Rs 199 including Delhivery courier. No extra courier charge. Order with the “Order hard copy on WhatsApp” button (+91 93546 37830). Pay to the Shri Chakradhar Publication Private Limited company account. The hard copy is posted by Delhivery on the next working day after payment.
- Available in English medium.
- Refund policy: read our refund policy before ordering.
Payments are received by Shri Chakradhar Publication Private Limited.
FAQ
Is this a ready project?
No. This is a format guide for MRWP-002. It contains no topic, data, analysis, findings or completed chapters and is not for submission. You write your project yourself.
Is it available in Hindi?
No. The guide is available in English medium only.
When is the hard copy sent?
The printed hard copy is posted by Delhivery on the next working day after payment. The price of Rs 199 includes the Delhivery courier, with no extra courier charge.
Who assigns the internal supervisor?
SOET assigns a faculty member at IGNOU headquarters according to the project area. The learner identifies the local supervisor.
Does the synopsis need an activity bar chart?
Yes. The handbook asks for a schedule of activities and a plan for the required facilities, equipment and tools.
How is the Major Project evaluation divided?
The handbook allocates 70% to the report and 30% to the viva-voce.
Is the student bio-data part of the technical report?
Yes. The report format lists a one-page student bio-data and related publications, if any.
Disclaimer
Shri Chakradhar Publication is an independent publisher and is not affiliated with IGNOU. No approval, marks or result is promised.
Course details: IGNOU MSCRWEE programme page.

